Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
topics:virtual_power_plant [2026/03/19 14:16] – removed - external edit (Unknown date) 127.0.0.1topics:virtual_power_plant [2026/04/03 22:14] (current) admin
Line 1: Line 1:
 +<WRAP catbadge>Actors and Stakeholders</WRAP>
 +
 +====== Virtual power plants ======
 +
 +<WRAP meta>
 +lead-authors:
 +contributors: Klaus Kubeczko
 +reviewers:
 +version: 0.1
 +updated: 26 March 2026
 +sensitivity: public
 +ai-use:
 +status: planned
 +</WRAP>
 +
 +<WRAP intro>
 +This topic is part of the ISGAN Wiki and is currently being developed. You can contribute directly by clicking the edit button, or use the [[about:newtopic|Topic Builder]] for guided input. A confirmed wiki account is required. Register and allow up to three days for admin confirmation. Before contributing, read the [[about:guidelines|ISGAN Wiki Editorial Guidelines]].
 +</WRAP>
 +
 +<WRAP insight>
 +This topic has not been drafted yet and could benefit from your expertise.
 +</WRAP>
 +
 +===== Why this matters =====
 +
 +<WRAP callout>
 +</WRAP>
 +
 +===== Shared definitions =====
 +
 +===== Perspectives =====
 +
 +<WRAP perspectives>
 +==== Actors and stakeholders ====
 +
 +==== Technologies and infrastructure ====
 +
 +==== Institutional structures ====
 +
 +</WRAP>
 +
 +===== Distinctions and overlaps =====
 +
 +===== Related topics =====
 +
 +[[topics:flexibility|Flexibility]] · [[topics:flexibility_markets|Flexibility markets]] · [[topics:energy_communities|Energy communities]] · [[topics:operator|Operator]] · [[topics:grid_edge|Grid edge]] · [[topics:users|Users]]
 +
 +===== Topic notes =====
 +
 +Old wiki page was titled "Community-based Virtual Power Plant (CVPP)". No dedicated content recovered from legacy compilation. Suggested scope: VPP as an aggregation architecture distinct from physical plants; CVPP as a community-ownership variant; relationship to aggregators, flexibility markets, and DSO coordination. Watson et al. 2022 transactive energy definitions (in grid_edge working notes) provide adjacent framing.
 +