Differences
This shows you the differences between two versions of the page.
| Next revision | Previous revision | ||
| topics:planning [2026/03/15 22:05] – created - external edit 127.0.0.1 | topics:planning [2026/10/05 15:10] (current) – vso_vso | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | <WRAP catbadge purple> | ||
| + | ====== Planning ====== | ||
| + | |||
| + | <WRAP meta> | ||
| + | lead-authors: | ||
| + | contributors: | ||
| + | reviewers: | ||
| + | version: 0.1 | ||
| + | updated: 4 October 2026 | ||
| + | sensitivity: | ||
| + | ai-use: Content creation · Drafting and source checking · ChatGPT (OpenAI) · Human review pending · 4 October 2026 | ||
| + | status: draft | ||
| + | </ | ||
| + | |||
| + | <WRAP intro> | ||
| + | Planning regards choices about electricity system needs, options and actions. In smart grid transitions, | ||
| + | </ | ||
| + | |||
| + | <WRAP insight> | ||
| + | Planning prepares infrastructure, | ||
| + | </ | ||
| + | |||
| + | ===== Why this matters ===== | ||
| + | |||
| + | Electricity networks often develop on a different timescale from the generation, consumption and services they connect. The International Energy Agency describes how planning, permitting and constructing grid infrastructure can take substantially longer than installing renewable generation or charging infrastructure. Planning across sectors helps anticipate where changes in transport, heating and industry may require capacity, flexibility or different operating arrangements.((International Energy Agency. (2023). // | ||
| + | |||
| + | A useful plan makes its assumptions visible. Demand growth, technology costs and the location of future connections can change during an investment cycle. Comparing options under several conditions helps decision-makers understand which commitments depend on a particular future. The resulting analysis can also identify choices that need further evidence before investment is authorised.((U.S. Department of Energy. (2024). //National transmission planning study//. https:// | ||
| + | |||
| + | <WRAP callout> | ||
| + | A planning result becomes actionable when the proposed investment, its timing and the responsibilities for delivering it can be examined together. A technically attractive option still needs a credible route through financing, coordination and approval.((International Smart Grid Action Network. (2024). //ISGAN policy brief: On long-term planning and implementation of smart distribution grids//. https:// | ||
| + | </ | ||
| + | |||
| + | ISGAN' | ||
| + | |||
| + | ===== Shared definitions ===== | ||
| + | |||
| + | Planning is the process of translating objectives and assumptions about future conditions into coordinated options, priorities and actions. This working definition draws on IRENA' | ||
| + | |||
| + | For electricity grids, the scope can range from national network development to a distribution operator' | ||
| + | |||
| + | ^ Planning task ^ Main question ^ Typical output ^ | ||
| + | | Strategic planning | Which objectives and directions guide development? | ||
| + | | Network development planning | What capacity, configuration and supporting services could be required? | Alternative development options and investment sequences | | ||
| + | | Implementation planning | How will an approved option be delivered? | Responsibilities, | ||
| + | | Adaptive planning | What observations would justify revisiting a decision? | Review points and conditional actions | | ||
| + | |||
| + | These are analytical distinctions for this topic, rather than a universal organisational model. Their boundaries vary with mandates and planning arrangements. ISGAN' | ||
| + | |||
| + | ===== Perspectives ===== | ||
| + | |||
| + | <WRAP perspectives> | ||
| + | ==== Actors and stakeholders ==== | ||
| + | |||
| + | Planning involves people who hold different information and different responsibilities. Operators can assess network performance; | ||
| + | |||
| + | <WRAP case> | ||
| + | **Brazil: National Energy Plan 2050**\\ | ||
| + | IRENA describes a participatory process in which Brazil' | ||
| + | </ | ||
| + | |||
| + | Participation also raises a practical question about representation: | ||
| + | |||
| + | ==== Technologies and infrastructure ==== | ||
| + | |||
| + | A planning model represents selected relationships in the electricity system. Its spatial and temporal resolution determines which questions it can address. A broad national analysis can compare alternative patterns of investment, while a local engineering study examines constraints at particular network locations. Moving between these levels requires checking that assumptions and outputs remain meaningful at the new scale.((U.S. Department of Energy. (2024). //National transmission planning study//. https:// | ||
| + | |||
| + | <WRAP case> | ||
| + | **United States: National Transmission Planning Study**\\ | ||
| + | The 2024 study used linked models to examine a range of future electricity-system conditions through 2050. It identified areas where interregional transmission could provide benefits, while leaving specific line routes and individual project approvals to other processes.((U.S. Department of Energy. (2024). //National transmission planning study//. https:// | ||
| + | </ | ||
| + | |||
| + | Physical reinforcement, | ||
| + | |||
| + | ==== Institutional structures ==== | ||
| + | |||
| + | Institutional arrangements determine who prepares a plan, who evaluates it and how its costs can be recovered. They also shape whether an operator can invest ahead of confirmed demand or revise an investment programme when circumstances change. ISGAN' | ||
| + | |||
| + | <WRAP case> | ||
| + | **China: Zhangjiakou' | ||
| + | The 2019 strategy was developed by the municipal authorities with the China National Renewable Energy Centre and IRENA. It examined a transition towards greater use of solar and wind over a thirty-year horizon, connecting a city's long-term ambitions with analysis of its energy system.((International Renewable Energy Agency. (2019). // | ||
| + | </ | ||
| + | |||
| + | Coordination can also involve different geographical scales. A municipal strategy may identify expected demand from new housing or transport, while the relevant network investment is planned across a larger service area. Recording the relationship between these plans makes it easier to identify where decisions depend on information or commitments held elsewhere. This is an application of IRENA' | ||
| + | </ | ||
| + | |||
| + | ===== Distinctions and overlaps ===== | ||
| + | |||
| + | <WRAP distinction> | ||
| + | **Planning and foresight**\\ | ||
| + | Foresight explores plausible changes and their implications. Planning uses such insights, alongside objectives and constraints, | ||
| + | </ | ||
| + | |||
| + | <WRAP distinction> | ||
| + | **Planning and forecasting**\\ | ||
| + | A forecast estimates what may happen under specified assumptions. Planning adds the question of what to do. Comparing alternative futures allows a decision to be examined beyond the conditions represented by one forecast.((U.S. Department of Energy. (2024). //National transmission planning study//. https:// | ||
| + | </ | ||
| + | |||
| + | <WRAP distinction> | ||
| + | **A plan and a decision**\\ | ||
| + | A plan can identify and sequence options before they are approved. Keeping the analysis and the authorising decision distinguishable makes it possible to discuss both the evidence and the reasons for committing resources.((International Smart Grid Action Network. (n.d.). // | ||
| + | </ | ||
| + | |||
| + | <WRAP distinction> | ||
| + | **Planning and governance**\\ | ||
| + | Planning is used to devise the relevant course of action within specific governance context. Changes in planning practice may consequently require changes in mandates or coordination arrangements.((International Smart Grid Action Network. (2024). //ISGAN policy brief: On long-term planning and implementation of smart distribution grids//. https:// | ||
| + | </ | ||
| + | |||
| + | ===== Related topics ===== | ||
| + | |||