Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
topics:balance_responsible_party [2026/03/14 12:34] – ↷ Page moved from balance_responsible_party to topics:balance_responsible_party admintopics:balance_responsible_party [2026/04/13 14:18] (current) klaus.kubeczko_ait.ac.at
Line 1: Line 1:
-====== Balance-Responsible Party in EU (BRP) ======+<WRAP catbadge>Actors and Stakeholders</WRAP>
  
-"A balance-responsible party, or BRP for short, is a company that can and may handle the balance responsibility for production and consumption units and/or trades actual electricity. Because this role gives access to the day-ahead market, the intraday market, and the balancing market, a BRP can be active in both the electricity market and the balancing market.+====== Balancing responsible party ======
  
-Last, but not least, the balance-responsible party is financially responsible for imbalances and deviations between planned and actual production, consumption, and trade of power.+<WRAP meta> 
 +lead-authors: 
 +contributors: Klaus Kubeczko 
 +reviewers: 
 +version: 0.
 +updated: 26 March 2026 
 +sensitivity: public 
 +ai-use: 
 +status: draft 
 +</WRAP>
  
-A balance-responsible party can also, by agreement with [the Transmission System Operator]deliver ancillary services, if technical and legal requirements are met.+<WRAP intro> 
 +This topic is part of the ISGAN Wiki and is currently being developed. You can contribute directly by clicking the edit buttonor use the [[about:newtopic|Topic Builder]] for guided input. A confirmed wiki account is required. Register and allow up to three days for admin confirmation. Before contributing, read the [[about:guidelines|ISGAN Wiki Editorial Guidelines]]. 
 +</WRAP>
  
-[Source: https://en.energinet.dk/electricity/new-player/become-a-balance-responsible-party/#:~:text=A%20balance%2Dresponsible%20party%2C%20or,and%2For%20trades%20actual%20electricity. Accessed 08.09.2023]+<WRAP insight> 
 +A Balancing Responsible Party (BRP) is an actor (such as an energy supplier, generator, or trader) in EU's energy systems that takes on the responsibility of balancing electricity supply. 
 +</WRAP> 
 + 
 +===== Why this matters ===== 
 + 
 +<WRAP callout> 
 +</WRAP> 
 + 
 +===== Shared definitions ===== 
 + 
 +A balancing responsible party (BRP) is an organisational unit within the EU energy system that handles balancing responsibility for production and consumption units and for electricity trades. The role gives access to the day-ahead market, the intraday market, and the balancing market, allowing a BRP to operate in both the electricity market and the balancing market. A BRP is financially responsible for imbalances and deviations between planned and actual production, consumption, and trade of power. By agreement with the transmission system operator, a BRP may also deliver ancillary services if technical and legal requirements are met.((Energinet. (2023). Become a balancing responsible party. https://en.energinet.dk/electricity/new-player/become-a-balance-responsible-party/ Accessed 8 September 2023.)) 
 + 
 +===== Perspectives ===== 
 + 
 +<WRAP perspectives> 
 +==== Actors and stakeholders ==== 
 + 
 +==== Technologies and infrastructure ==== 
 + 
 +==== Institutional structures ==== 
 + 
 +</WRAP> 
 + 
 +===== Distinctions and overlaps ===== 
 + 
 +===== Related topics ===== 
 + 
 +[[topics:markets|Markets]] · [[topics:flexibility_markets|Flexibility markets]] · [[topics:operator|Operator]] · [[topics:flexibility|Flexibility]] · [[topics:institutions|Institutions]] 
 + 
 +~~DISCUSSION|Discussion~~