 +<WRAP catbadge>Actors and Stakeholders</WRAP>
  
 +====== Balancing responsible party ======
 +
 +<WRAP meta>
 +lead-authors:
 +contributors: Klaus Kubeczko
 +reviewers:
 +version: 0.2
 +updated: 26 March 2026
 +sensitivity: public
 +ai-use:
 +status: draft
 +</WRAP>
 +
 +<WRAP intro>
 +This topic is part of the ISGAN Wiki and is currently being developed. You can contribute directly by clicking the edit button, or use the [[about:newtopic|Topic Builder]] for guided input. A confirmed wiki account is required. Register and allow up to three days for admin confirmation. Before contributing, read the [[about:guidelines|ISGAN Wiki Editorial Guidelines]].
 +</WRAP>
 +
 +<WRAP insight>
 +A Balancing Responsible Party (BRP) is an actor (such as an energy supplier, generator, or trader) in EU's energy systems that takes on the responsibility of balancing electricity supply.
 +</WRAP>
 +
 +===== Why this matters =====
 +
 +<WRAP callout>
 +</WRAP>
 +
 +===== Shared definitions =====
 +
 +A balancing responsible party (BRP) is an organisational unit within the EU energy system that handles balancing responsibility for production and consumption units and for electricity trades. The role gives access to the day-ahead market, the intraday market, and the balancing market, allowing a BRP to operate in both the electricity market and the balancing market. A BRP is financially responsible for imbalances and deviations between planned and actual production, consumption, and trade of power. By agreement with the transmission system operator, a BRP may also deliver ancillary services if technical and legal requirements are met.((Energinet. (2023). Become a balancing responsible party. https://en.energinet.dk/electricity/new-player/become-a-balance-responsible-party/ Accessed 8 September 2023.))
 +
 +===== Perspectives =====
 +
 +<WRAP perspectives>
 +==== Actors and stakeholders ====
 +
 +==== Technologies and infrastructure ====
 +
 +==== Institutional structures ====
 +
 +</WRAP>
 +
 +===== Distinctions and overlaps =====
 +
 +===== Related topics =====
 +
 +[[topics:markets|Markets]] · [[topics:flexibility_markets|Flexibility markets]] · [[topics:operator|Operator]] · [[topics:flexibility|Flexibility]] · [[topics:institutions|Institutions]]
 +
 +~~DISCUSSION|Discussion~~